ESIESSENTIAL SHIPYARD INDUSTRIESProduction Tech 1 · Essential Shipyard University
ESI
Essential Shipyard University · Mandatory pre-employment training

ESI Production Tech 1 — Kaizen & lean for every process

The mandatory first course for every ESI employee — completed at hire, before any trade module. It is how ESI works: Kaizen and lean production applied to every process. See the 8 wastes, run 5S, work to standard, plan and cart the job, keep daily notes in the boatyard app, and use the ** Kaizen marker to turn what you find in the field into how the whole yard works.

RequiredPre-employment
10Chapters
1Certificate

Before you start

How this course works

This is the mandatory first training for every ESI employee — completed at or before hire, ahead of any trade module or field work. ESI Production Tech 1 is the company-wide course in how we work — Kaizen and lean production applied to every ESI process, from the drivetrain bench to the front desk. It teaches you to see waste, organize the work, keep daily notes in the boatyard app, and use the ** Kaizen marker to turn what you find in the field into how the whole yard works. A short check ends each chapter; an in-depth final exam unlocks your certificate.

♻️Every process

Lean & Kaizen applied across the whole yard, not one trade.

📓Boatyard app

Daily notes are the habit the whole system rests on.

⭐⭐The ** marker

Two asterisks + tag the manager = a field find becomes a standard.

Chapter 1

♻️What Is Kaizen — Improvement Is the Job

Every tech, every day, makes ESI a little better.

What you will be able to do
  • Define Kaizen and continuous improvement
  • Explain why small daily gains compound
  • See yourself as the engine of ESI's improvement

Kaizen is a Japanese word for continuous improvement — getting a little better, every day, everywhere. It isn't a big once-a-year project; it's a hundred small fixes found by the people doing the work. At ESI, Kaizen is how we run every process — drivetrain, electrical, heaters, the front desk, the yard.

1Small gains compound

Shave five minutes off a job, find a better tool, stop one wasted trip — on its own it's nothing. Multiply it across every tech, every boat, every day of the year and it's the difference between a yard that's busy and a yard that's profitable and respected. Improvement isn't extra work on top of the job — it is part of the job.

2You are the engine

Improvement at ESI doesn't come from a manual written in an office. It comes from you, in the field, noticing what slows you down and what could be done better. Management can't see what you see on the boat. This course gives you the language and the habits to turn what you notice into how the whole company works.

Why it mattersA boatyard runs on thin margins and tight schedules. The shops that thrive are the ones that quietly remove waste every week. Kaizen is that engine — and you are the engine.
ESI ruleProduction Tech 1 is the mandatory first training for every ESI employee — office, yard or field — completed at or before hire. It is the shared language the whole company works in, so everyone starts here.
★ KaizenThis is the whole course in one line: see a better way → write it down → flag it → we adopt it. Everything else is detail.

✓Quick check

Chapter 2

🗑️The 8 Wastes — Learn to See Them

You can't remove waste you can't see.

What you will be able to do
  • Name the 8 wastes of lean production
  • Spot each one in a real boatyard day
  • Use waste as your radar for what to flag

Lean production names eight kinds of waste — any effort the customer would never want to pay for. Once you can name them, you start seeing them everywhere. A handy memory is DOWNTIME.

WasteIn the yard it looks like
DefectsRework, a redo, a callback, a leak you have to fix twice.
OverproductionDoing more than the job needs, prepping parts you won't use.
WaitingStanding around for a part, a lift, a sign-off, another trade.
Non-used talentA skilled tech doing what an apprentice could, ideas never asked for.
TransportationHauling parts and gear back and forth across the yard.
InventoryPiles of stock or materials sitting, tying up cash and space.
MotionWalking to the shop, searching for a tool, reaching, bending — wasted movement.
Extra-processingDoing more steps than the spec needs; gold-plating.
1Real losses — a few examples from our own jobs

These come straight from our own jobs and the ESI course modules. They are only examples — pick any process in the yard and you will find loss in it:

Job / processThe loss (real)Waste** fix
Cutless bearing replaceWalked back to the shop twice for the puller and the right toolsMotionStandard cutless kit on the drivetrain cart: strut-prop puller or blind puller, plus chisel, hammer and pipe wrench
Shaft alignmentSkipped the in-water re-check, got a vibration callback, re-aligned afloatDefectMake the afloat re-align a hard checklist step (ABYC P-6-2021)
Max-Prop pitchBoat sat on the hard while the front desk confirmed pitch with PYIWaitingCapture engine/vessel specs at intake so pitch is confirmed before haul-out
Glide shaft sealWe cannot stock every seal size, so the right spare was not on handWaiting / DefectRecord the Glide seal size and number on day one, during the 18-point inspection, so the spare is ordered and staged before the work
Heater first-lightRe-primed and second-guessed because the controller buttons variedWaitingPhotograph the exact controller and menu into the job file
AlternatorBelt squealed on the sea trial, came back to re-tension and alignDefectAdd laser alignment and a tension check to the standard install
Lithium main fuseTrip to the shop for the right high-AIC Class T fuseMotionKeep Class T fuses stocked on the electrical cart
Engine-out repowerBilge not cleaned and coated while open — no second chance once the engine is inExtra work laterClean and coat the room engine-out, every time — it is the one shot
Why it mattersEvery row above is a waste — but they are only examples. The wastes in a boatyard are effectively infinite, and so are the solutions to remove them. The skill is not memorizing this list; it is learning to see the next loss nobody has named yet and flag it. That is the whole game, and it never ends.
2Waste is your radar

The two that bite a boatyard hardest are Motion and Waiting — walking, searching, and standing by. Every time you feel one, that's a Kaizen waiting to be flagged. You don't have to fix the whole system; you just have to see it and mark it.

★ KaizenWhen a job feels slow or annoying, ask “which waste is this?” Name it, and you've found something worth a ** note.

✓Quick check

Chapter 3

🧹5S — A Place for Everything

An organized space is a fast, safe space.

What you will be able to do
  • Apply the five S's to a cart, a bench and a boat
  • Make the right tool the easy tool to grab
  • Sustain order so it doesn't slide back

5S is how lean makes a workspace efficient and keeps it that way. It's the backbone of the cart, the bench, the truck and the boat.

SWhat you do
SortRemove what you don't need from the work area. If it's not used, it's in the way.
Set in orderA home for every tool, the most-used closest to hand. A glance tells you what's missing.
ShineClean as you go; a clean space shows problems (a leak, a lost part) instantly.
StandardizeThe same layout every cart, every truck — so anyone can work from anyone's kit.
SustainReset it at the end of every job. Order that isn't maintained is gone in a week.
Why it mattersMost of a tech's wasted time is Motion — looking for things. 5S attacks that directly: when every tool has a home and the home is near the work, you stop searching and start working.
ESI ruleYour cart and kit are 5S'd before you roll to the boat and reset when you roll back. A shadow-board or labeled layout means a missing tool is obvious at a glance.
★ KaizenA tool you keep walking back for, or a layout that fights you, is a ** flag — maybe we need a second tool on the cart, or a better box.

✓Quick check

Chapter 4

📋Standard Work — The Best Known Way

Improvement needs a baseline to improve from.

What you will be able to do
  • Explain what standard work is and why we use it
  • See our courses and checklists as standard work
  • Understand that you improve the standard, not ignore it

Standard work is the current best-known way to do a task, written down so everyone does it the same way. Our ESI courses, SOPs and checklists are standard work — the heater install sequence, the shaft alignment procedure, the front-desk SOP.

1Why a standard at all

Two reasons. First, consistency: the job comes out the same, to spec, whoever does it. Second — and this is the Kaizen part — you can't improve what isn't stable. If everyone does a task differently, you can't tell whether a new idea is actually better. The standard is the baseline you measure improvement against.

2Follow it — then beat it

Standard work is not a cage. You follow the current standard and you look for the better way. When you find one and we prove it out, the standard changes and everyone gets the upgrade. That's the loop: standard → improvement → new standard.

ESI ruleWork to the current standard unless safety demands otherwise. If you think you've found a better way, you don't quietly freelance it — you flag it so we test it and, if it's better, make it the new standard for everyone.
★ Kaizen“We always fight this step” is a gift. A clunky standard is exactly what Kaizen exists to fix — flag it with **.

✓Quick check

Chapter 5

🛒Efficiency in Motion — Plan, Cart, Trips

The daily habits that remove the most waste.

What you will be able to do
  • Pre-plan a job and stage it on a cart
  • Cut trips to the shop and know why they cost
  • Track your trips as a number you can improve

The biggest daily wins come from three habits that attack Motion and Waiting head-on.

1Pre-plan the trip

Before you walk to the boat, think the job through end to end and gather the tools, parts and equipment you'll need. A planned job is a fast job; a forgotten tool is a trip you didn't have to make.

2Work from a cart

Use a cart for each job, 5S'd, so everything travels with you and stays in one place — not scattered, not back in the shop.

3Walking costs money — count your trips

Every trip back to the shop is unbillable time the job eats. Walking costs money. Keep tools organized and near, and count the extra trips you make to the shop and log the number in the boatyard app. Trips-per-job, tracked over time, is one of the cleanest measures of how well we plan.

Why it mattersYou can't improve what you don't measure. The trip count turns a vague “that job was a hassle” into a number that shows whether pre-planning and 5S are actually working.
★ KaizenA repeated trip for the same missing item is a ** flag every time — it usually means the cart kit or the standard pack-list needs that item added.

✓Quick check

Chapter 6

📓Daily Notes in the Boatyard App

If it isn't written down, it never happened.

What you will be able to do
  • Update your boatyard-app notes every day
  • Record the right things — including efficiency notes
  • Feed real data back into how we improve

The boatyard app is where the crew already log their jobs. Kaizen lives or dies on whether those notes actually get written — daily, while it's fresh.

1Write it the same day

At the end of each job or day, update your notes in the boatyard app. Memory fades by the next morning; the detail you don't capture today is gone. Daily notes are the habit the whole system rests on.

2What to record
Why it mattersYour notes are the yard's memory and its data. A leak that comes back, a part that's always wrong, a step that always drags — the pattern only shows up if the notes are there to see it.
ESI ruleNotes go in the boatyard app, every day. “I'll remember it” is not a system; the app is.

✓Quick check

Chapter 7

⭐⭐The ** Kaizen Marker — Flag It, Tag the Manager

Two asterisks turn a frustration into an upgrade.

What you will be able to do
  • Use ** as the ESI Kaizen marker in your notes
  • Know the three things that trigger a flag
  • Tag the manager so the idea gets actioned

This is the one habit that makes the whole course real. Inside your boatyard-app note, ** (two asterisks) is the ESI Kaizen marker. Drop it on anything that could be done better, and tag the manager so it gets seen.

1The three triggers

Flag it with ** whenever a job could be improved by:

2How to write it

Keep it short and specific, in the note, with the marker and the manager tagged:

Re-bed stanchion bases — bedding cures slow, lost ~20 min waiting.
** a cordless caulk gun would save that on every deck job. @manager
Shaft pull — had to walk back twice for the blind puller.
** add a blind puller to the standard drivetrain cart kit. @manager
3Why the tag matters

A ** with no tag can sit unseen. Tagging the manager routes it to the person who can test it, buy the tool, or change the standard. The marker plus the tag is the signal that turns your note into action.

ESI rule** + @manager is the ESI Kaizen signal. Two asterisks on anything a tool or a better method would improve, manager tagged. That's the entire reporting standard — simple on purpose.
Never trade this awayThere are no bad ** flags and nobody is judged for raising one. A flag that turns out small still costs nothing; a flag never raised can cost the yard for years. When in doubt, mark it.
★ KaizenYou are the heart of ESI in the field. The ** marker is how what you see becomes what we all do. Flag freely.

✓Quick check

Chapter 8

🔁PDCA — How a Flag Becomes a Standard

Closing the loop so good ideas actually stick.

What you will be able to do
  • Walk a flag through Plan-Do-Check-Act
  • Understand the manager's half of the loop
  • See how a field idea becomes everyone's standard

A ** flag isn't the end — it's the start of a loop called PDCA: Plan, Do, Check, Act. It's how an idea is tested and, if it works, made permanent.

StepWhat happens
PlanThe flagged idea is reviewed — what would we change, and what do we expect to gain?
DoTry it small — one cart, one job, one boat.
CheckDid it actually help? Compare against the old way (trips saved, time, quality).
ActIf it worked, make it the standard — update the kit, the SOP, the course — and train everyone. If not, learn and move on.
1Your half and the yard's half

Your half is the ** flag and the notes behind it. The manager's half is running PDCA on it. Both halves are needed: ideas with no testing stay opinions; testing with no field ideas has nothing to improve.

Why it mattersPDCA is what stops good ideas from evaporating. Without it, a great trick lives in one tech's head; with it, that trick becomes how the whole yard works — and shows up in the next version of the course.
★ KaizenWhen one of your flags becomes a new standard, that's the system working — your name is on a better ESI.

✓Quick check

Chapter 9

✅Quality at the Source — To Spec, Clean, Inspected

Speed is worthless if the work has to come back.

What you will be able to do
  • Build quality in rather than inspecting it in
  • Finish to spec, clean, and pass the lead's PDI
  • Never pass a defect downstream

Lean is fast and right — the two go together, because the most expensive waste is a defect that comes back. ESI builds quality in at every step instead of hoping to catch it at the end.

1Quality at the source

Don't pass a defect downstream. If a step isn't right, stop and fix it now — a bad joint, a wrong measurement, a missed torque costs minutes now and a callback later. Catching it at your station is cheap; catching it at the customer's dock is not.

2Finish the ESI way
Never trade this awayA clean, inspected, to-spec handover is non-negotiable. Efficiency that produces callbacks isn't efficiency — it's the most expensive waste there is.
ESI ruleNo job is done until it's to spec, cleaned, and inspected by the lead. The PDI is the yard's last quality gate before the customer.
★ KaizenIf a defect keeps showing up at the same step, that's a process problem, not a people problem — flag the step with ** so we fix the root cause.

✓Quick check

Chapter 10

🤝Respect, Safety & the Culture

Kaizen only works where people feel safe to speak up.

What you will be able to do
  • Connect Kaizen to respect for people and safety
  • Go and see the work (gemba) before judging it
  • Carry the ESI culture of improvement

Lean has two pillars: continuous improvement and respect for people. They're inseparable — you only get a flood of good ** flags in a yard where it's safe to point out problems without blame.

1Respect & psychological safety

Flags are about processes, not people. We attack the problem, not the person who raised it. A tech who surfaces a defect or a clunky step is doing exactly what we want — that's how the yard gets better. Blame kills the flow of ideas; respect keeps it open.

2Safety is never the trade

Efficiency never comes at the cost of safety. A faster way that's less safe is not an improvement — it's the opposite. If a “better method” adds risk, it fails Kaizen. Safe and efficient, or it doesn't ship.

3Go and see (gemba)

The best decisions are made where the work happens — on the boat, at the bench — not from a desk. That's gemba: go and see. It's why your field notes and flags carry so much weight: you're standing where the truth is.

Why it mattersA culture of improvement is a competitive advantage no competitor can copy. Tools and methods can be bought; a crew that improves the yard every day cannot.
★ KaizenYou're certified in this when it's a habit: see it, note it (boatyard app), flag it (**), tag the manager. That's how ESI gets better — because of you.

✓Quick check

Final certification

🎓Final exam

A short check ran at the end of each chapter. Pass this final at 80% to unlock your certificate.

🎓ESI Production Tech 1 — Final Exam

ESSENTIAL SHIPYARD UNIVERSITY
Certificate of Completion
This certifies that
has successfully completed ESI Production Tech 1 — Kaizen & lean production — and passed the final examination to the ESI standard.
Jason Knott
President
Essential Shipyard Industries
★CERTIFIED
Date Issued
Essential Shipyard University